RE: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Stephan Schmitt
Nick Dokos wrote: Chris Randle wrote: I had problems getting date arithmetic to work in tables. I posted my findings and solutions here: http://article.gmane.org/gmane.emacs.orgmode/6536/ Don't know if it will fix your problem (too lazy to try!) but I suspect it will. It did! I don't underst

Re: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Nick Dokos
Chris Randle <[EMAIL PROTECTED]> wrote: > Nick Dokos wrote: > > I've been trying to make a table with the following structure: column > > 1 contains either a date or is empty; column 2 contains a date that's > > calculated from the corresponding date in column 1 (if column 1 > > contains a date) o

RE: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Chris Randle
Nick Dokos wrote: > I've been trying to make a table with the following structure: column > 1 contains either a date or is empty; column 2 contains a date that's > calculated from the corresponding date in column 1 (if column 1 > contains a date) or is empty (if column 1 is empty). In the example >

[Orgmode] Problem with date calculations in a table

2008-08-14 Thread Nick Dokos
I've been trying to make a table with the following structure: column 1 contains either a date or is empty; column 2 contains a date that's calculated from the corresponding date in column 1 (if column 1 contains a date) or is empty (if column 1 is empty). In the example below, column 2 is supposed