Nick Dokos wrote:
Chris Randle wrote:
I had problems getting date arithmetic to work in tables. I posted my
findings and solutions here:
http://article.gmane.org/gmane.emacs.orgmode/6536/
Don't know if it will fix your problem (too lazy to try!) but I suspect
it will.
It did! I don't underst
Chris Randle <[EMAIL PROTECTED]> wrote:
> Nick Dokos wrote:
> > I've been trying to make a table with the following structure: column
> > 1 contains either a date or is empty; column 2 contains a date that's
> > calculated from the corresponding date in column 1 (if column 1
> > contains a date) o
Nick Dokos wrote:
> I've been trying to make a table with the following structure: column
> 1 contains either a date or is empty; column 2 contains a date that's
> calculated from the corresponding date in column 1 (if column 1
> contains a date) or is empty (if column 1 is empty). In the example
>
I've been trying to make a table with the following structure: column 1
contains either a date or is empty; column 2 contains a date that's
calculated from the corresponding date in column 1 (if column 1 contains
a date) or is empty (if column 1 is empty). In the example below, column
2 is supposed