On 7/12/2023 4:12 PM, Alan Previn wrote:
On MTL, if the GSC Proxy init flows haven't completed, submissions to the
GSC engine will fail. Those init flows are dependent on the mei's
gsc_proxy component that is loaded in parallel with i915 and a
worker that could potentially start after i915 dri
On MTL, if the GSC Proxy init flows haven't completed, submissions to the
GSC engine will fail. Those init flows are dependent on the mei's
gsc_proxy component that is loaded in parallel with i915 and a
worker that could potentially start after i915 driver init is done.
That said, all subsytems th