Hi there,
I am doing some test for my controller to handle the situation when some of
the switches in the topology lose the connection to the controller. The
part of the topology will be something like this:
S1(DPID:11,port4)——(DPID:23,port3)S13(DPID:23,port2)—— (DPID:22,port3)S12
At first, all
Hi there,
I am doing some test for my controller to handle the situation when some of the
switches in the topology lose the connection to the controller. The part of
the topology will be something like this:
S1(DPID:11,port4)——(DPID:23,port3)S13(DPID:23,port2)—— (DPID:22,port3)S12
At first, a