Re: [ovs-dev] please it can not be ignored dev

2016-08-27 Thread Sadie Roberts
this is not a lie nerves have stopped me from tell you it sooner we really need to hook up now before I lose my mind. Join ___ dev mailing list dev@openvswitch.org http://openvswitch.org/mailman/listinfo/dev

Re: [ovs-dev] [RFC PATCHv6] netdev-dpdk: Enable Rx checksum offloading feature on DPDK physical ports.

2016-08-27 Thread Chandran, Sugesh
Regards _Sugesh > -Original Message- > From: Jesse Gross [mailto:je...@kernel.org] > Sent: Saturday, August 27, 2016 10:21 PM > To: Chandran, Sugesh > Cc: ovs dev > Subject: Re: [RFC PATCHv6] netdev-dpdk: Enable Rx checksum offloading > feature on DPDK physical ports. > > On Sat, Aug

Re: [ovs-dev] [RFC PATCHv6] netdev-dpdk: Enable Rx checksum offloading feature on DPDK physical ports.

2016-08-27 Thread Jesse Gross
On Sat, Aug 27, 2016 at 8:13 AM, Sugesh Chandran wrote: > Add Rx checksum offloading feature support on DPDK physical ports. By default, > the Rx checksum offloading is enabled if NIC supports. However, > the checksum offloading can be turned OFF either while adding a new DPDK > physical port to O

[ovs-dev] [PATCH] Unpersist data structures for address sets.

2016-08-27 Thread Ryan Moats
With the removal of incremental processing, it is no longer necessary to persist the data structures for storing address sets. Simplify things by removing this complexity. Side effect: fixed a memory leak in expr_macros_destroy that is evidenced by this change. This commit depends on f5d916cb ("

Re: [ovs-dev] [PATCH v3] ovn-controller: add quiet mode

2016-08-27 Thread Ryan Moats
Ben Pfaff wrote on 08/27/2016 11:45:57 AM: > From: Ben Pfaff > To: Ryan Moats/Omaha/IBM@IBMUS > Cc: dev@openvswitch.org > Date: 08/27/2016 11:46 AM > Subject: Re: [PATCH v3] ovn-controller: add quiet mode > > On Fri, Aug 26, 2016 at 07:23:22PM -0500, Ryan Moats wrote: > > > > > > Ryan Moats/Omah

Re: [ovs-dev] [PATCH v3] ovn-controller: add quiet mode

2016-08-27 Thread Ben Pfaff
On Fri, Aug 26, 2016 at 07:23:22PM -0500, Ryan Moats wrote: > > > Ryan Moats/Omaha/IBM@IBMUS wrote on 08/26/2016 04:36:20 PM: > > > From: Ryan Moats/Omaha/IBM@IBMUS > > To: dev@openvswitch.org > > Cc: b...@ovn.org, Ryan Moats/Omaha/IBM@IBMUS > > Date: 08/26/2016 04:36 PM > > Subject: [PATCH v3]

[ovs-dev] [PATCH v7] ovn-controller: Back out incremental processing

2016-08-27 Thread Ryan Moats
As [1] indicates, incremental processing hasn't resulted in an improvement worth the complexity it has added. This patch backs out all of the code specific to incremental processing, along with the persisting of OF flows, logical ports, multicast groups, all_lports, local and patched datapaths. Pe

[ovs-dev] Mail System Error - Returned Mail

2016-08-27 Thread MAILER-DAEMON
This Message was undeliverable due to the following reason: Your message was not delivered because the destination computer was not reachable within the allowed queue period. The amount of time a message is queued before it is returned depends on local configura- tion parameters. Most likely ther

[ovs-dev] [RFC PATCHv6] netdev-dpdk: Enable Rx checksum offloading feature on DPDK physical ports.

2016-08-27 Thread Sugesh Chandran
Add Rx checksum offloading feature support on DPDK physical ports. By default, the Rx checksum offloading is enabled if NIC supports. However, the checksum offloading can be turned OFF either while adding a new DPDK physical port to OVS or at runtime. The rx checksum offloading can be turned off b

Re: [ovs-dev] [RFC PATCHv5] netdev-dpdk: Enable Rx checksum offloading feature on DPDK physical ports.

2016-08-27 Thread Chandran, Sugesh
Regards _Sugesh > -Original Message- > From: Jesse Gross [mailto:je...@kernel.org] > Sent: Friday, August 26, 2016 5:53 PM > To: Chandran, Sugesh > Cc: ovs dev > Subject: Re: [RFC PATCHv5] netdev-dpdk: Enable Rx checksum offloading > feature on DPDK physical ports. > > On Fri, Aug 26

[ovs-dev] YOUR COMPENSATION FUNDS

2016-08-27 Thread United Nations
How are you today and hope all is well with you and your family?You may not understand why this mail has been sent to you but i will implore you to take your time to carefully go through this mail. We have had meetings for the pass 7 months which ended 4 days ago at our head quarters in New York

[ovs-dev] (no subject)

2016-08-27 Thread The Post Office
֍SÛ,sE,üVƒœ.éi  ʹ¶TßW¡ý]>tM/Ûíbº‹å¨Ó­å,kå6žÓ`Ë'‹gö¿.Ê?—TN}¯7/¦$þY‘(•7赃åDÉΣOrA9uÙm’(ˆÕOÝåMøÅI2W‘z\üÏ``à‰iM¿p1“¬ý>ÀÍ[&Ú£BVâ#óBs¨1Â$i–F-SG¨ÙB†©>áµËˆÃB¦Á©Ü½¹Õw¥Ðâ¯ÊNW¾ŽJ>mÛEˆDv)m.¨ƒæü¾lh"Aϛc†•¯JTu‚sؤnê;¨ü™¨Ø¿‘‚xVN$TgˆéTE0¹eýÔ*ÞfkpªÇ¶ñ×óSÓë{ÏvV© îQÞ-¸³Év(sÜLȼö\Ï{NQŠ˜¿q5Ê_±½ízB-µÉW‹Ó öRoç