Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-10-04 Thread Alex Herbert
I tried a RC1 for RNG and it failed on validation of the BOM within nexus. The BOM was staged but the GPG signature file did not match the artifact. I have updated the project to sign and deploy the BOM and will try again when the change is verified to work for snapshots by the CI builds. Alex

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-10-03 Thread Gary Gregory
the > > commons release process. > > > > Alex > > > > [1] > > > https://maven.apache.org/guides/introduction/introduction-to-dependency-mechanism.html > > [2] https://github.com/jboss/bom-builder-maven-plugin > > [3] > > > https://search.

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-10-03 Thread Alex Herbert
] https://github.com/gradle-bom/gradle-bom-generator-plugin > [6] > https://github.com/junit-team/junit5/blob/main/junit-bom/junit-bom.gradle.kts > [7] https://repository.apache.org/service/local/staging/deploy/maven2 > [8] https://maven.apache.org/settings.html > [9] > https://www.

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-10-03 Thread Alex Herbert
On Thu, 29 Sept 2022 at 13:21, Xeno Amess wrote: > even better if we have a BOM for whole apache commons. > A BOM specifies what versions are expected to work together. All commons components are low level and have few dependencies. Ideally a BOM is not required as we try to ensure binary and fu

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-09-29 Thread Alex Herbert
er 29, 2022 8:05:14 PM > To: Commons Developers List > Subject: Re: [rng] Release 1.5 with Bill Of Materials (BOM) > > That sounds like a good idea! > > Gary > > On Thu, Sep 29, 2022 at 5:27 AM Alex Herbert > wrote: > > > I think RNG is ready for a release. >

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-09-29 Thread Xeno Amess
even better if we have a BOM for whole apache commons. From: Gary Gregory Sent: Thursday, September 29, 2022 8:05:14 PM To: Commons Developers List Subject: Re: [rng] Release 1.5 with Bill Of Materials (BOM) That sounds like a good idea! Gary On Thu, Sep 29

Re: [rng] Release 1.5 with Bill Of Materials (BOM)

2022-09-29 Thread Gary Gregory
That sounds like a good idea! Gary On Thu, Sep 29, 2022 at 5:27 AM Alex Herbert wrote: > I think RNG is ready for a release. > > In 1.5 the multi-module project rearranges a few methods to default > interface methods in a different module. This is binary compatible. However > it requires that a