the 4.8.2.0 and 4.9.1.0 testing effective 14 August 2016 @
GMT. During this period, only defects that stabilize changes since the
previous release should be merged into these release branches. This test
period is scheduled to occur from 15 to 20 August 2016 with a release candidate
being
All,
Per our release schedule [1], the 4.8 and 4.9 branches enter a soft freeze for
testing for the 4.8.2.0 and 4.9.1.0 testing effective 14 August 2016 @
GMT. During this period, only defects that stabilize changes since the
previous release should be merged into these release branches