Re: 4.8.2.0 and 4.9.1.0 Testing

2016-08-14 Thread Milamber
the 4.8.2.0 and 4.9.1.0 testing effective 14 August 2016 @ GMT. During this period, only defects that stabilize changes since the previous release should be merged into these release branches. This test period is scheduled to occur from 15 to 20 August 2016 with a release candidate being

4.8.2.0 and 4.9.1.0 Testing

2016-08-14 Thread John Burwell
All, Per our release schedule [1], the 4.8 and 4.9 branches enter a soft freeze for testing for the 4.8.2.0 and 4.9.1.0 testing effective 14 August 2016 @ GMT. During this period, only defects that stabilize changes since the previous release should be merged into these release branches