On Sat, 2017-09-23 at 16:28 +0100, Jonathan Wiltshire wrote:
> The second point release for "stretch" (9.2) is scheduled for
> Saturday,
> October 7th. Processing of new uploads into stretch-proposed-updates
> will
> be frozen during the preceding weekend.
The archive side of the point release has
Hi,
The second point release for "stretch" (9.2) is scheduled for Saturday,
October 7th. Processing of new uploads into stretch-proposed-updates will
be frozen during the preceding weekend.
--
Jonathan Wiltshire j...@debian.org
Debian Developer
2 matches
Mail list logo