Re: Scheduling 9.9

2019-03-24 Thread Joerg Jaspert
On 15351 March 1977, Jonathan Wiltshire wrote: - April 27 Wfm. -- bye, Joerg

Re: Scheduling 9.7

2019-01-19 Thread Joerg Jaspert
On 15286 March 1977, Jonathan Wiltshire wrote: - Feb 9 - Feb 16 Can deal with both. -- bye, Joerg

Re: Scheduling 9.5

2018-06-24 Thread Joerg Jaspert
On 15077 March 1977, Adam D. Barratt wrote: >> - July 7th >> - July 14th >> Are people available for either or both of those dates? > The 7th is looking like the favourite so far (although would mean > freezing next weekend), but we still need an ftp-master (N)ACK on > either / both date. No way f

Re: Scheduling 9.5

2018-05-20 Thread Joerg Jaspert
On 15037 March 1977, Jonathan Wiltshire wrote: > - May 26th (meaning freeze this coming weekend, which might be a big > ask) No. > - Jun 2nd (which may require an unusual SRM) Possible. > - Jun 9th (getting quite a way out of cadence, but maybe that can't be >helped) Possible. -- bye

Re: Scheduling final Jessie point release, 8.11

2018-05-20 Thread Joerg Jaspert
On 15037 March 1977, Jonathan Wiltshire wrote: > - 23rd Jun Ok. > - 7th July No. -- bye, Joerg

Re: Scheduling 9.4

2018-02-14 Thread Joerg Jaspert
On 14944 March 1977, Julien Cristau wrote: > we shipped 9.3 a couple of months ago, so we're overdue for 9.4. > Can you please let us know your availability on the following: > - March 3 > - March 10 Can do. > - March 17 Not very good > - March 24 > - March 31 No way. -- bye, Joerg

Re: Scheduling 9.1, maybe 8.9

2017-06-27 Thread Joerg Jaspert
On 14714 March 1977, Jonathan Wiltshire wrote: > A month or so from 9.0 bring us to about 15th July. How would any of these > suit? Is 8.9 at the same time feasible? > 8/9 July (probably a bit soon) > 15/16 July Both of them don't work for me. > 22/23 July That I could do. -- bye, Joerg

Re: 8.8 planning

2017-03-28 Thread Joerg Jaspert
On 14611 March 1977, Julien Cristau wrote: > * April 8-9 No > * April 15-16 Possible > * April 22-23 Ok > * April 29-30 Ok > * May 6-7 No. -- bye, Joerg

Re: 8.7 planning

2016-12-19 Thread Joerg Jaspert
On 14526 March 1977, Julien Cristau wrote: > Jan 7th/8th > Jan 14th/15th Should work. > Jan 21st/22nd > Jan 28th/29th - Cambridge BSP, probably not ideal > Feb 4th/5th - FOSDEM, probably not great either > Feb 11th/12th None of them for me. -- bye, Joerg

Re: 8.5 and 7.11 planning

2016-05-14 Thread Joerg Jaspert
On 14307 March 1977, Julien Cristau wrote: > with wheezy EOL, we should get a final point release out. In order to > avoid version skew, it'd be good to have a jessie point release around > the same time, so if that works for everyone let's do them both on the > same Saturday again. > June 4th/5t

Re: Bug#804315: [Vmdebootstrap-devel] Namespace issues

2015-11-09 Thread Joerg Jaspert
On 14120 March 1977, Iain R. Learmonth wrote: > It is worth noting that live-build is not a Debian project, it is an > external project that claims to be an official Debian project. This is > something that needs to be fixed. It is worth noting that you do not declare such things. Such an attitude

Re: 8.2 and 7.9 planning

2015-08-24 Thread Joerg Jaspert
On 14037 March 1977, Adam D. Barratt wrote: > We're somewhat overdue for both 8.2 and 7.9 now (in that order). Some > potential September dates: > 5/6th - okay for me > 12/13th - the 12th doesn't work for me until at least mid-afternoon > 19th/20th - looks okay > 26th/27th - looks okay All dates d

Re: 8.1 (and maybe 7.9) planning

2015-05-25 Thread Joerg Jaspert
On 13951 March 1977, Adam D. Barratt wrote: >> > Based on received responses and the current date, I'm proposing June 6th >> > for 8.1 (and then looking at other dates for 7.9). Does that still work >> > for people? >> Sounds ok to me. Start at 10 UTC or earlier/later? > I was assuming either 8ish

Re: 8.1 (and maybe 7.9) planning

2015-05-21 Thread Joerg Jaspert
On 13947 March 1977, Adam D. Barratt wrote: >> > As seems to have become the norm, now that Jessie's out it's time to >> > start planning for the first point release. >> > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9 >> > really wants to take place after 8.1, as we have s

Re: Scheduling for 7.3

2013-12-02 Thread Joerg Jaspert
>> According to the normal schedule, the point release for 7.3 is due >> somewhere around 12th December. >> How does everybody look for the weekends of: >> 14th/5th >> 21st/22nd >> 28th/29th December? > Based on the responses so far, if we want to be sure to have an > ftpmaster, SRM and CD-master

Re: Wheezy point release planning

2013-05-12 Thread Joerg Jaspert
On 13209 March 1977, Adam D. Barratt wrote: > Based on some informal queries a little while ago, the weekend of 15/16 > June looks like a good date for the first wheezy point release. Would > that work for everyone? I'll be away then, with a TZ=UTC+8 and not very good net connection. So I'm basic

Re: Planning for next squeeze point release (6.0.4)

2012-01-07 Thread Joerg Jaspert
>> > As an opening gambit, I'd propose we look at one of the following >> > Saturdays in January: 14th, 21st, 28th. >> 21st and 28th (with the respective day after the actual release day, to >> do the live images) are fine for me. > The 28th would be preferable for me. Would that still work for e