>I've prepared an NMU for lxtask (versioned as 0.1.9-1.1) and uploaded
>it to DELAYED/14. Please feel free to tell me if I should cancel it.
Thank you very much. There is an issue with GIT which we tried to fix
and failed. It was what delayed the actual fix for so long. After all it
was decided to
Control: tags 957510 + patch
Control: tags 957510 + pending
Dear maintainer,
I've prepared an NMU for lxtask (versioned as 0.1.9-1.1) and uploaded
it to DELAYED/14. Please feel free to tell me if I should cancel it.
cu
Adrian
diff -Nru lxtask-0.1.9/debian/changelog lxtask-0.1.9/debian/changelog
2 matches
Mail list logo