Eric Warnke wrote:
I would _presume_ it used the one in the job description ( more
specific ), but you can always tell by issuing a the reload and run
command in bconsole to preview what pool it's using.
According to the docs, the settings in the Schedule take precedence over
the settings in
I would _presume_ it used the one in the job description ( more specific ), but you can always tell by issuing a the reload and run command in bconsole to preview what pool it's using.
On 4/18/06, Thomas Deutsch <[EMAIL PROTECTED]> wrote:
HiIf I have a pool=default in Job{} and tis schedule:Schedul
Hi
If I have a pool=default in Job{} and tis schedule:
Schedule {
Name = "MonthlyCycle"
Run = Level=Full Pool=Monthly 1st sun at 1:05
}
which pool does he use? default or Monthly?
thx,
Thomas
---
This SF.Net email is sponsored by xPML,