Hi Kern,
Thanks for your reply.
For clarity: If the spooling job finished spooling before the not spooling job.
The not spooling job will stop writing data to the volume and the spooling job
will write (despool) to the volume (the mentioned lock). After the spooling
jobs finish writing, the no
On 11/29/2014 09:01 PM, Patrick wrote:
> Hi,
>
> Last night I started two jobs, one with data spooling and the other without
> data spooling. Both jobs used the same pool and only one tape drive was
> available.
>
> What I have seen from the logs:
> Both jobs started. The without data spooling jo
Hi,
Last night I started two jobs, one with data spooling and the other without
data spooling. Both jobs used the same pool and only one tape drive was
available.
What I have seen from the logs:
Both jobs started. The without data spooling job mounted the tape drive with a
volume from the desi