Re: [Bacula-users] Schedule Resource Job overrides question

2007-10-11 Thread Hydro Meteor
Oops, Sorry folks, I realized after I emailed this question that the question itself was poorly framed (e.g., the Storage Directive must be of type File) -- I presume that the Pool choices to restore from (Differential, Incremental, Full) are presented to the administrator via the console. Sorry

Re: [Bacula-users] Schedule Resource Job overrides question

2007-10-11 Thread Hydro Meteor
Philip, et al, What about for Jobs that are Restore Types? Can one specify the Full Backup, Incremental Backup and Differential Backup Pool directives for Restore jobs rather than a mere "Pool" directive and thus ability to override a mere "Storage" directive? Best regards, -H On 10/10/07, Phil

Re: [Bacula-users] Schedule Resource Job overrides question

2007-10-10 Thread Hydro Meteor
Philip, Thank you very much for checking my logic. I also think its logically makes sense to take your suggestion of including the multiple pools within the Job resource as you suggest (instead of relying solely on indirect reference to these pools via the Schedule Resource Job overrides) -- even

[Bacula-users] Schedule Resource Job overrides question

2007-10-10 Thread Hydro Meteor
Hello all -- In the Director Daemon configuration file (bacula-dir.conf), I am defining a simple backup Job Resource that points to a Schedule Resource. My Schedule Resource contains three backup types (with corresponding Pool Resources that I have also in the configuration file): # When to do th