I would think a pool specified on a Schedule resource's Run line should
override the pool specified in the Job resource. The problem is that
only Pool= can be specified as a Run option. So when a Run line
specifies a pool and the job level is upgraded to full from differential
or incremental, t
Hello,
From time to time, I've heard some complaints about the way Bacula selects
pools, but it has never been specific enough for me to do something. Now, I
have an example where I have defined an Incremental Pool, and in using the
"run" command, even though the job is an Incremental job, the