Hi,
>Remember that the schedule will override the Pool and Level in the job.
>http://bacula.org/5.0.x-manuals/en/main/main/Configuring_Director.html#SECTION00185
>
GREAT!
Thanks,
Stefan
___
Schon gehört? WEB.DE hat einen g
> Schedule {
> Name = "Daily"
> Run = Level = Incremental Pool = Monday mon at 18:00
> Run = Level = Incremental Pool = Tuesday tue at 18:00
> Run = Level = Incremental Pool = Wednesday wed at 18:00
> Run = Level = Incremental Pool = Thursday thu at 18:00
> Run = Level = Incremental Pool =
2011/6/3 "Stefan Günther" :
> Hi,
>
>>If you do label each day I would use separate pools otherwise at some
>>point (holiday, missed backup ...) you will get out of sync and bacula
>>will ask for a Friday tape on Monday..
>>
> just to sum it up:
>
> 1. I would have to create separate pools for ever
Hi,
>If you do label each day I would use separate pools otherwise at some
>point (holiday, missed backup ...) you will get out of sync and bacula
>will ask for a Friday tape on Monday..
>
just to sum it up:
1. I would have to create separate pools for everyday.
2. I would have to create an entry
2011/5/31 "Stefan Günther" :
> Hi,
>
> °Why do you want to do that? Lets Bacula manages all the tapes.
> °
> Well, I would, but my client want's to have a visible prove that the monday
> backup has been saved on the corresponding tape.
>
> °° Do I have to create a single pool for every single day
Hi,
°Why do you want to do that? Lets Bacula manages all the tapes.
°
Well, I would, but my client want's to have a visible prove that the monday
backup has been saved on the corresponding tape.
°° Do I have to create a single pool for every single day together with a
single entry for every day
Hello,
2011/5/31 "Stefan Günther"
>
> I already wrote the days Mon-Sun on the tapes.
>
>
Good for you.
> My question now is, who do I tell Bacula to use the "monday" tape in slot 1
> for the backup on monday evening and so on?
>
>
Why do you want to do that? Lets Bacula manages all the tapes.
Hello,
I have a tapeloader with 8 slots, filled with 7 backup tapes and a cleaning
tape.
I already wrote the days Mon-Sun on the tapes.
My question now is, who do I tell Bacula to use the "monday" tape in slot 1 for
the backup on monday evening and so on?
Do I have to create a single pool for