Troy Daniels wrote:
> Hi,
>
>> I want to make sure that after the last scheduled job for the day
>> runs, that the mounted tape is changed to a status of 'used'. How
>> can I run a job to do this?
>>
>
> You can try using any one of the following options:
>
> Maximum Volume Jobs =
> Volume Use
Hi,
> I want to make sure that after the last scheduled job for the day runs,
> that the mounted tape is changed to a status of 'used'. How can I run a
> job to do this?
>
You can try using any one of the following options:
Maximum Volume Jobs =
Volume Use Duration =
Info on them is avail
I want to make sure that after the last scheduled job for the day runs,
that the mounted tape is changed to a status of 'used'. How can I run a
job to do this?
Thanks
brian
-
This SF.net email is sponsored by: Splunk Inc.