Fredag 16 februar 2007 20:19 skrev Naufal Zamir:
> Hi,
>
> I am facing the following problem:
>
> I have configured a job resource for a system with the backup level full.
> Now when i create another job which has everything same but the backup
> level differential or incremental, since the job nam
Hi,
I am facing the following problem:
I have configured a job resource for a system with the backup level full.
Now when i create another job which has everything same but the backup level
differential or incremental, since the job name is different it
automatically reverts to full backup. I ju