How do I define that there should be a differential the third and last saterday?
This is what I have now, but it should be the thirth and fifth saterday :
Level=Differential 2nd-5th sat at 0:05
Is this a good idea :
Run = Level=Full 1st sat at 0:05
Run = Level=Differential 2nd
I am totally confused about the Maximum Concurrent Jobs directive in Bacula.
I'm full of hope that somebody here could be my light.
Little image of my situation :
I have some clients with the Bacula FD installed on 2 different locations.
I have 2 SD's, each one on a location.
I have a Catalog s