Fwd: Simple doubt on scheduling

2015-11-26 Thread Fábio Chicout
urly schedules. Is possible any workaround? Att, Fábio Chicout

Re: Fwd: Simple doubt on scheduling

2015-11-30 Thread Fábio Chicout
server answer is not hitting the point but i think you are somehow reaching this limit: "The duration of the window must be shorter than the period between windows." Regards Krzysztof 2015-11-26 15:06 GMT+01:00 Fábio Chicout : > Guys, > > I've tried to set up a schedule on

Broken Drive

2016-09-21 Thread Fábio Chicout
Hi, there! I've got a broken drive here and my tape library is working only with 1 drive (a IBM TS3200). As it's only with 1 drive, all reclamation is failing. Me and my team had a (very) crazy idea on using a VTL as a second drive to make (eventual, not scheduled) reclamation, while we're work