to back up via the scheduler
Hi TSM,
Recently, we restored an NT(Lotus Notes) node into a test box
using 2 node names.
We then successfully did a manual backup of the test box. So far so
good.
However, the overnight backup for the test box via scheduler
failed. Here'
Hi TSM,
Recently, we restored an NT(Lotus Notes) node into a test box
using 2 node names.
We then successfully did a manual backup of the test box. So far so
good.
However, the overnight backup for the test box via scheduler
failed. Here's the error logs-
05-02-2001 11:2