Thanks for the reply, Wanda. Our RPO is a week (beauty of a research
environment), and we do two DB backups every day (one kept onsite, one kept
offsite), so whether we get today's or yesterday's DB backups in the MOVE
DRM isn't so important to us.
I considered doing a day-of-week test in the scri
Well, that's a little confusing -
Your BACKUP STGPOOLs must be completed and *then* a DB backup created before
you send them offsite, yes? And if that DB backup doesn't go, then then copy
tapes are useless anyway?
You can put WAIT=YES on your BACKUP STGPOOL cmd, and follow that in your
mainten
We've been suffering with the effects of this APAR for a while, which IBM
fixed as a documentation errata rather than fixing TSM itself:
http://www-01.ibm.com/support/docview.wss?uid=swg1IC87352
Basically the issue is that there is a race condition with running MOVE
DRMEDIA on tape volumes while
Oh VMware gurus:
I have a TSM4VE 7.1 datamover on a W2K8 VM that is working great, snapping and
backing up around 250 VMs nightly. My VMVSTORTRANSPORT used to be the default,
and 6 Windows VMs would backup over NBD, the rest over hotadd, as desired. OK,
one of the VMs has an IDE(!) disk, so I u