Hi - I'd like some guidance on how to move some of my tickets forward, #25351, for example. Once #25351 is closed, then we can move on to #25390, which depends on #25351 and will give us multivariate polynomial factorization over QQbar.
Patchbot shows two test failures on #25351 involving magma. I don't think this is due to my changes, but I don't have magma, so how can I be sure? Is there a ticket somewhere that shows patchbot running with magma against 8.4.beta1? If not, it seems like a reasonable feature to have - something that shows any test failures against the current release tag. Other than that, the last comment on the ticket (by mmezzarobba) was positive, but that was six weeks ago. I've updated the ticket's git branch by merging in 8.4.beta1 and have resolved all of the patchbot failures other than the magma issues. Are there any suggestions on what else can I do to encourage forward movement on the ticket? Thanks. agape brent -- You received this message because you are subscribed to the Google Groups "sage-devel" group. To unsubscribe from this group and stop receiving emails from it, send an email to sage-devel+unsubscr...@googlegroups.com. To post to this group, send email to sage-devel@googlegroups.com. Visit this group at https://groups.google.com/group/sage-devel. For more options, visit https://groups.google.com/d/optout.