I used the term "critical loads subpanel" for many years until the NEC
specified that special meaning for medical equipment and such. I got caught
out by an AHJ official just as you did, Dan. I switched to "essential loads
subpanel" though "backed up loads subpanel" is probably more specific.
Dan Fink
Owner, Buckville Energy Consulting LLC
IREC Certified Instructor for PV and Small Wind Installation
NABCEP Certified PV System Inspector
NABCEP PV Associate
d <[email protected]>[email protected]
970-672-4342




On Sat, Aug 9, 2025 at 11:46 AM William Miller via RE-wrenches <
[email protected]> wrote:

> Ok: Priority loads.
> William Miller
> Miller Solar.com
> 805-438-5600
> www.millersolar.com
>
>
>
>
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to