I used the term "critical loads subpanel" for many years until the NEC specified that special meaning for medical equipment and such. I got caught out by an AHJ official just as you did, Dan. I switched to "essential loads subpanel" though "backed up loads subpanel" is probably more specific. Dan Fink Owner, Buckville Energy Consulting LLC IREC Certified Instructor for PV and Small Wind Installation NABCEP Certified PV System Inspector NABCEP PV Associate d <[email protected]>[email protected] 970-672-4342
On Sat, Aug 9, 2025 at 11:46 AM William Miller via RE-wrenches < [email protected]> wrote: > Ok: Priority loads. > William Miller > Miller Solar.com > 805-438-5600 > www.millersolar.com > > > >
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/[email protected]/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org

