Greetings wrenches,
In Pacific Power territory we are coming up against roadblocks with regards
to whole house battery backup systems with inverter ratings higher than
25kw. Even when the generation capacity is below the 25kw residential
limit, net metering applications are being rejected based on the inverter
rating.. The inverter rating in these cases is sized to handle the
customer's existing loads and will never export more than the 25kw limit
dictated by Oregon PUC.  I am drafting a letter to Energy Trust, the state,
etc. But am curious if anyone else gas had this problem or come up with a
solution. I would appreciate to hear any experiences or similar
interactions with PGE or PPL or even how this has worked in other
jurisdictions, states, etc. Any input or support is greatly appreciated.

Tyrone Houck
Oregon Solarworks LLC
CCB #204937 LRT #076
541-787-1366
tyr...@oregonsolarworks.com
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to