I have a customer that has self installed an array on a metal roof using APS 
Rapid shutdown devices. The roof rack is standard rails and L-feet. It is a 
high voltage system that will be connected to a Sol-Ark but it has yet to be 
connected, just MC cables from each set of 8 panels (3 altogether) run back to 
the location where the Sol-Ark will be installed. He raised a concern about 
what he described as leakage of current to the metal roof:

"I did experience noticeable “leakage” of current to our roof prior to 
installation of the ground cable...Working around the metal roof one could 
definitely feel the tingle of the current, and it persisted until I had the 
ground cable connected.”

My only guess is that possibly the APS devices are leaking at connection point 
but not sure how to check or he had an unprotected end of the MC cable touching 
the roof but that wouldn’t leak with the APS shutoff installed as it would need 
a signal from the transmitter that is not yet installed in the Sol-Ark. The 
panels are LG375’s.

Ron
earthRight Solar - Solareagle.com 
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to