Friends:
I received the following correction noticed from a hired plan-checker: *Please provide the technical listing for the support rail system documenting that the supports have been tested with the PERC 60 panels. The UL 2703 listing requires the two to be tested/listed together for the rack to functionally ground the solar panels. [CEC 690.43(A)] Alternately, bond the metal parts of PV equipment to grounded metal supports per CEC 690.43(B).* Is it true that UL2703 requires testing with each and every type of module? I am using 100 Series rail from my stock with Mission MSE325SR8K panels. Does anyone have any documentation on file that would satisfy this request? I have sent an inquiry to Snap-n-rack about this but they often take a week or more to respond. Thanks in advance. William Miller Miller Solar 17395 Oak Road, Atascadero, CA 93422 805-438-5600 www.millersolar.com CA Lic. 773985
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org