I have a project requiring the Solar Edge optimizers (P370 or P860) on an Ecofoot 2 mounting system with 72 cell modules. Curious as to what is being done to mount the optimizers to either the module frame or the Ecofoot 2 base. A picture could be worth a thousand words.
With Kind Regards Carl Adams, President SunRock Solar, LLC 513.290.9072 (mobile) 513.766.6025 (office)
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org