I have a project requiring the Solar Edge optimizers (P370 or P860) on an
Ecofoot 2 mounting system with 72 cell modules.  Curious as to what is
being done to mount the  optimizers to either the module frame or the
Ecofoot 2 base.  A picture could be worth a thousand words.