Looking at a project with a 1000A fused disconnect at the POI connecting on
the supply side of an existing service. I’m curious if there’s a general
consensus in the industry on whether the requirements of 230.95 would apply
here and whether best-practice (or requirement) would dictate use of an
LSIG breaker instead of the disco. I know some will say that this is a
“supply side connection” and not a service so 230 doesn’t apply. This would
also introduce some other oddities like connecting a PV system behind GFP,
not allowed by 705.32, though I believe the exception to 705.32 would apply
since it’s a dedicated GFP for the second source.



Thanks in advance!

Evan
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to