Hi Wrenches,

When making a supply side connection on parallel sets of conductors is it 
required to tap all conductors on each phase?

I have a set of plans with an 800A interconnection on a 1200A service.  Service 
has three parallel sets of 500MCM. Plans call for tapping just two conductors 
on each set of three. Plans are stamped by an EE.  I had been working under the 
assumption that if tapping parallel sets all conductors must be tapped.

Any issues with not tapping all sets?

Thanks,

Garrison Riegel
Rethink Electric 
630-998-3629
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to