Hi Wrenches, When making a supply side connection on parallel sets of conductors is it required to tap all conductors on each phase?
I have a set of plans with an 800A interconnection on a 1200A service. Service has three parallel sets of 500MCM. Plans call for tapping just two conductors on each set of three. Plans are stamped by an EE. I had been working under the assumption that if tapping parallel sets all conductors must be tapped. Any issues with not tapping all sets? Thanks, Garrison Riegel Rethink Electric 630-998-3629 _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org