Hey Gary,
Ohio Fire Code does cover this. It’s a matter of if the Fire marshal in you project area wants to waive or alter the requirements. http://codes.ohio.gov/oac/1301:7-7-06v1 Specifically 605.11.1.2 is for residential buildings. There is some conflict in terms of Hip roofs in the code there. 605.11.1.2.2 states a single 3ft path on one edge or another for a hip roof, but 605.11.1.2.4 states that an 18 space is allowed when modules are mounted on two adjacent roof planes with a hip roof. With Regards, Daniel Young, NABCEP Certified PV Installation ProfessionalTM: Cert #031508-90 From: RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of gary easton Sent: Monday, July 09, 2018 3:39 PM To: RE-wrenches <re-wrenches@lists.re-wrenches.org> Subject: [RE-wrenches] Solar set backs Hello Wrenches, What are you all seeing required as setbacks post 2017? I am having inspectors vary between wanting a 3' lane at the bottom and sides to allowing the array down to the gutter, and from requiring between 18" and 3' at the ridge. -- Gary Easton Appalachian Renewable Power Stewart, Ohio 45778 NABCEP Certified Solar PV T: 740-277-8498 www.arp-solar.com <http://www.arp-solar.com> “First they ignore you. Then they laugh at you. Then they fight you. Then you win.” ~Ghandi
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org