Hey Gary,

 

Ohio Fire Code does cover this. It’s a matter of if the Fire marshal in you 
project area wants to waive or alter the requirements.

 

http://codes.ohio.gov/oac/1301:7-7-06v1 

 

Specifically 605.11.1.2 is for residential buildings. There is some conflict in 
terms of Hip roofs in the code there. 605.11.1.2.2 states a single 3ft path on 
one edge or another for a hip roof, but 605.11.1.2.4 states that an 18 space is 
allowed when modules are mounted on two adjacent roof planes with a hip roof.

 

With Regards,

 

Daniel Young, 

NABCEP Certified PV Installation ProfessionalTM: Cert #031508-90 

 

From: RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of gary 
easton
Sent: Monday, July 09, 2018 3:39 PM
To: RE-wrenches <re-wrenches@lists.re-wrenches.org>
Subject: [RE-wrenches] Solar set backs

 

Hello Wrenches,

What are you all seeing required as setbacks post 2017?  I am having inspectors 
vary between wanting a 3' lane at the bottom and sides to allowing the array 
down to the gutter, and from requiring between 18" and 3' at the ridge.    


 

-- 

Gary Easton
Appalachian Renewable Power

Stewart, Ohio 45778
NABCEP Certified Solar PV                                                       
     
T: 740-277-8498

 www.arp-solar.com <http://www.arp-solar.com> 

 


“First they ignore you. Then they laugh at you. Then they fight you. Then you 
win.”


~Ghandi

 

_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to