I'm taking on construction of a ground mount system of about 30KW. My previous experience has entailed using a utility truck mounted auger for the holes but that's expensive. The soil type here is fairly soft, not rock. There's no contractor available with a skid steer mounted auger. I need at least four inch holes, three foot deep. Siz inch would be better. What are the options? Any novel ideas? We have a service truck with a 2 ton hydraulic crane, anything I can mount to that? I don't mind fabricating brackets and mounts, welding parts to it.
-- Chris Mason NABCEP Certified Solar PV Installerâ„¢ Solar Design Engineer Generac Generators Industrial technician www.cometsolar.com <http://www.cometenergysystems.com> 264.235.5670 869.662.5670 Skype: netconcepts
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org

