We never did the calculation for pole mounts. We just used the biggest base size they listed and cast on an extra foot of depth in the form of a square footer. We figured that an extra half yard of concrete is cheap compared to the cost of the digging and form setting. The cost of a 36" sonotube instead of a 32" one is minimal. Peace of mind is priceless.
Hilton Hilton Dier III Renewable Energy Design Missisquoi River Hydro LLC _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org