We never did the calculation for pole mounts. We just used the biggest base 
size they listed and cast on an extra foot of depth in the form of a square 
footer. We figured that an extra half yard of concrete is cheap compared to the 
cost of the digging and form setting. The cost of a 36" sonotube instead of a 
32" one is minimal. Peace of mind is priceless.

Hilton

Hilton Dier III
Renewable Energy Design
Missisquoi River Hydro LLC