Hello Wrenches,

Are any upgrades needed on a distribution grid for interconnection, other than bigger services for large arrays where existing equipment is inadequate? Does the existing grid function fine as is, until a saturation point is reached, which I have heard is around 25%?

After saturation is reached, what is needed to balance consumption with generation? (How is this handled in Germany?) Is 25% an accurate number for the saturation limit?

Thanks,

Drake

Drake Chamberlin
Athens Electric LLC
OH License 44810
CO License 3773
NABCEP Certified Solar PV
740-448-7328
<http://athens-electric.com/>http://athens-electric.com/



---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to