FYI, our affected systems with Enphase M190s are back to normal as of Saturday morning. I hope that's the case for others as well.

Cheers,
Louis

Rebecca Lundberg wrote:
Thanks for the reply. I reported it to Enphase but have not heard back yet. Since one of these updates happened 5 months ago I was surprised the manufacturer hadn't notified installers in the interim before they did a more wide spread update, which is why I wrote to this list. I'm not in tech support, but seeing what it did to our inverter back 5 months ago I certainly wouldn't have continued the 'upgrade' and pushed that firmware update to the rest of the units! I think most people didn't notice so they just went ahead. I know MN temperatures are more extreme than other parts of the country so perhaps we've seen more failures than others have. But this site with 8 M190s was doing just fine before the 'update.'

Rebecca



    From: RE-wrenches
    [mailto:re-wrenches-boun...@lists.re-wrenches.org
    <mailto:re-wrenches-boun...@lists.re-wrenches.org>] On Behalf Of
    Louis Woofenden
    Sent: Wednesday, 03 February, 2016 11:48
    To: RE-wrenches
    Subject: Re: [RE-wrenches] Enphase M190 current limiting


    Hi Rebecca and all,

    We're experiencing the same thing on several M190 sites, though
    not all. Interestingly, M190s that have been replaced are not
    having the same problem.

    According to Enphase, it is a software problem. My understanding
    is that they are rolling back software updates on affected devices
    to solve the problem, but I'm not clear on the exact order that
    will happen.

    Not sure if being a squeaky wheel on particular systems is going
    to hurt or help. Kind of disappointing that they didn't properly
    beta test any software updates on all types of microinverter
    devices before rolling them out to all customers. Seems like that
    would be common sense.

    Best,
    Louis

    --

    Louis Woofenden
    Engineering Director
    Net Zero Solar, LLC
    101. W. 5th St., Tucson, AZ 85705
    Arizona ROC #248710, 259756, 259521

    Phone: <tel:520.207.4053> 520.207.4053 Ex. 2

    Cell: <tel:520.237.5040> 520.237.5040
    Fax: <tel:520.203.7230> 520.203.7230

    NABCEP Certified PV Installation Professional?
    NABCEP Certified Solar Heating Installer?



    Luke Christy wrote:



    Hi Rebecca,

    After you posted this I looked at the power production history for
    several of our Enphase sites with M190s, and the same thing is
    happening. Inverter output is being clipped at 140W across the board.

    This seems like a pretty big deal in terms of potential lost
    production for a lot of users.



    Have you brought this up with Enphase?



    -Luke





    NABCEP Certified PV Installation Professional?: Certification
    #031409-25
    NABCEP Certified Solar Heating Installer?: Certification #ST032611-03
    CoSEIA Certified PV Installer

    Solar Gain Services, LLC
    PO Box 531
    Monte Vista, CO 81144
    sgsrenewab...@gmail.com <mailto:sgsrenewab...@gmail.com>
    719.588.3044 <tel:719.588.3044>
    www.sgsrenewables.com <http://www.sgsrenewables.com>
    <http://www.sgsrenewables.com/>


    On Jan 31, 2016, at 21:08, Rebecca Lundberg
    <rebecca.lundb...@powerfullygreen.com
    <mailto:rebecca.lundb...@powerfullygreen.com>> wrote:

    I just noticed that several of our sites with Enphase M190s are
    current limiting at 140 watts. These units used to clip at 199
    watts so I feel like our customers just lost a potential 30% of
    their power output. It appears to be related to a firmware update
    520-00008-r01-v01.08.00. We've got one site with just 8 units, 1
    of them got this firmware update back in September and has been
    limiting to 140w since then, 5 of them got this update in late
    January and have been limiting to 140w since then, the other two
    are at a previous firmware version and are performing as we would
    expect up to 199w. Have any of you noticed this same thing? Do you
    know what this is about? It doesn't feel very fair on the user end
    of things.

    Sincerely,


    Rebecca Lundberg
    Powerfully Gree

    ? n?

    Minnesota



    _______________________________________________
    List sponsored by Redwood Alliance

    List Address: RE-wrenches@lists.re-wrenches.org
    <mailto:RE-wrenches@lists.re-wrenches.org>

    Change listserver email address & settings:
    http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

    List-Archive:
    http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

    List rules & etiquette:
    www.re-wrenches.org/etiquette.htm
    <http://www.re-wrenches.org/etiquette.htm>

    Check out or update participant bios:
    www.members.re-wrenches.org <http://www.members.re-wrenches.org>




    --
    --

    Louis Woofenden
    Engineering Director
    Net Zero Solar, LLC
    101. W. 5th St., Tucson, AZ 85705
    Arizona ROC #248710, 259756, 259521

    Phone: <tel:520.207.4053 <tel:520.207.4053>> 520.207.4053
    <tel:520.207.4053> Ex. 2

    Cell: <tel:520.237.5040 <tel:520.237.5040>> 520.237.5040
    <tel:520.237.5040>
    Fax: <tel:520.203.7230 <tel:520.203.7230>> 520.203.7230
    <tel:520.203.7230>

    NABCEP Certified PV Installation Professional?
    NABCEP Certified Solar Heating Installer?



    -------------- next part --------------
    An HTML attachment was scrubbed...
    URL:
    
<http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160204/030202bc/attachment.htm>
    -------------- next part --------------
    A non-text attachment was scrubbed...
    Name: not available
    Type: image/png
    Size: 152751 bytes
    Desc: not available
    URL:
    
<http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160204/030202bc/attachment.png>

    ------------------------------

    Subject: Digest Footer

    _______________________________________________
    List sponsored by Redwood Alliance

    List Address: RE-wrenches@lists.re-wrenches.org
    <mailto:RE-wrenches@lists.re-wrenches.org>

    Change listserver email address & settings:
    http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

    List-Archive:
    http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

    List rules & etiquette:
    www.re-wrenches.org/etiquette.htm
    <http://www.re-wrenches.org/etiquette.htm>

    Check out or update participant bios:
    www.members.re-wrenches.org <http://www.members.re-wrenches.org>


    ------------------------------

    End of RE-wrenches Digest, Vol 9, Issue 51
    ******************************************


_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address&  settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules&  etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org


_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to