Mick,

You are in luck!
The Classic controller can be programmed to skip up to 32 days of bulk charging.

Look for this in the Main menu under Charge/ Advanced/ Skip....and select the # of days you want to skip.

Not sure what firmware version this goes back to but the current one (1849) has it.
Roy Butler
NABCEP Certified Solar PV Installer®
NYSERDA eligible PV & wind installer
IREC Certified Master Trainer™ for Small Wind Installer
Four Winds Renewable Energy, LLC
8902 Route 46, Arkport, NY 14807
607-324-9747  www.four-winds-energy.com

Don't miss the 11th Annual Small Wind Conference
A Gathering of Installers, Manufacturers, Dealers, & Distributors
June 15-17, 2015 in Stevens Point, Wisconsin
www.smallwindconference.com

Although no trees were killed in the sending of this message, 
a large number of electrons were terribly inconvenienced.

                
On 10/6/2014 10:16 AM, Mick Abraham wrote:
Greetings, Mechanics~

My client's (flooded lead acid) battery is in Float almost all the time, courtesy of an XW inverter stack plus public utility power while the system waits in standby. "Selling to grid" is not enabled for complicated reasons, so here's the problem.

Each day at sunup, the Midnite charge controls implement a new 3 stage charge cycle including a lengthy absorption interval. The batteries require frequent water additions and there may be other deleterious effects from running a complete bulk/absorb charge every day on a battery that's already highly charged. 

Possible solutions: 

(1) We could tweak the Midnite settings for a short absorption interval with less gassing...but if a prolonged grid outage should develop we would wish the absorption interval had not been shortened.

(2) Your suggestions here, please. The client would be willing to update and/or reconfigure their Midnite software if that would help or the client would even consider hardware revisions. We chose the Midnite controllers in 2011 largely because of their 250 volt input ceiling, btw. 

++++++++++++++++++++++++++++++++++++

Thinking ahead to my future but similar projects:

Does any DC charge controller know that a new absorb cycle is not needed each day provided that the battery never dropped below Float the night before? A full cycle would still be wanted every 30 days or so just to stir things up, so that's almost like a 30 day equalization trigger only it would be a bulk trigger instead.

OR: would "selling to grid" avert this problem since the "battery backup with grid tie" type inverter is aware that the battery never left the Float stage?

OR: would AC coupling also avert this problem even if "sell to grid" is not enabled, for the same reason cited above?

OR: Your suggestions here, please.

Thanks & Jolliness, Mechanix. The Wrench List is the Bomb!

Mick Abraham, Proprietor
www.abrahamsolar.com

Voice: 970-731-4675


_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org


_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to