That information should be in the original agreement. Do you have a copy? In Florida, FPL only requires that you notify them if you increase the gross power rating, defined as the DC-STC array rating times 0.85.
Jason Szumlanski Fafco Solar From: re-wrenches-boun...@lists.re-wrenches.org [mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Mark Frye Sent: Saturday, August 20, 2011 11:21 AM To: 'RE-wrenches' Subject: [RE-wrenches] PG&E Interconnection Agreement Equipment Changes Folks, Has anyone talked with PG&E about needing (or not needing) a new Interconnection Agreement when changing out inverter make and model without increasing the size of the PV generator (number of modules) on a system that is already interconnected? Mark Frye Berkeley Solar Electric Systems 303 Redbud Way Nevada City, CA 95959 (530) 401-8024 www.berkeleysolar.com <http://www.berkeleysolar.com>
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org