Thanks for all the responses so far!

So others' efforts are not redundant, it's so far been pointed out that:
-I misuse "panel" and "module" and "array" frequently.
-Direct PV grid tie is almost always over 300v (shows how little I know about grid tie, I've been living off grid for 18 years now...)
-"feed circuit" is misused, should be "source"
- The drawing on slide 15 should change --"the load center should be connected directly to the meter, and the inverter should be connected to the load center (dedicated branch circuit), and the loads should be connected to the load center (non-dedicated branch circuits)."
- utility-interactive is a better term than grid-tie

Keep the comments and corrections coming when you get the time! They are much appreciated.
DAN
_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to