In the old days I soldered all the
crimp connections that went into the module J-boxes, but now that
j-boxes are a thing of that past, so is the soldering. In those days
systems were always 12 volt, so resistance in electrical connections
was a bigger deal. Todd North Texas Renewable Energy Inc wrote:
|
_______________________________________________ List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org