On 17/08/2022 05.46, Bin Meng wrote:
Current project timeout is 1 hour, but the check-gprof-gcov job never
completes within 1 hour. Increase the job timeout to 90 minutes.

Signed-off-by: Bin Meng <bmeng...@gmail.com>
---

  .gitlab-ci.d/buildtest.yml | 1 +
  1 file changed, 1 insertion(+)

diff --git a/.gitlab-ci.d/buildtest.yml b/.gitlab-ci.d/buildtest.yml
index 1931b77b49..52d45508fb 100644
--- a/.gitlab-ci.d/buildtest.yml
+++ b/.gitlab-ci.d/buildtest.yml
@@ -495,6 +495,7 @@ check-gprof-gcov:
    variables:
      IMAGE: ubuntu2004
      MAKE_CHECK_ARGS: check
+  timeout: 90m
    after_script:
      - ${CI_PROJECT_DIR}/scripts/ci/coverage-summary.sh

Thanks, I think we could use this as a workaround ... for tackling the real problem, we have to figure out a way to speed up the migration tests in the CI, see:

 https://lists.gnu.org/archive/html/qemu-devel/2022-08/msg01219.html

 Thomas


Reply via email to