On 12 August 2015 at 17:40, Paolo Bonzini <[email protected]> wrote: > From: KONRAD Frederic <[email protected]> > > Protect the list of queued work items with something other than > the BQL, as a preparation for running the work items outside it. > > Signed-off-by: KONRAD Frederic <[email protected]> > Signed-off-by: Paolo Bonzini <[email protected]>
Reviewed-by: Peter Maydell <[email protected]> thanks -- PMM
