On 12 August 2015 at 17:40, Paolo Bonzini <[email protected]> wrote:
> From: KONRAD Frederic <[email protected]>
>
> Protect the list of queued work items with something other than
> the BQL, as a preparation for running the work items outside it.
>
> Signed-off-by: KONRAD Frederic <[email protected]>
> Signed-off-by: Paolo Bonzini <[email protected]>

Reviewed-by: Peter Maydell <[email protected]>

thanks
-- PMM

Reply via email to