On Mon, Mar 25, 2019 at 10:29:46AM +0100, Fabien COELHO wrote: > I have run the non regression tests. I'm not sure of what scenarii are > covered there, but probably not an interruption in the middle of a fsync, > specially if fsync is usually disabled to ease the tests:-)
Force the tool to stop at a specific point requires a booby-trap. And even if fsync is not killed, you could just enforce the tool to stop once before updating the control file, and attempt a re-run without the trap, checking if it works at the second attempt, so the problem is quite independent from the timing of fsync(). -- Michael
signature.asc
Description: PGP signature