Hi,
I
am using postgresql-8.1-beta3 on WinXP SP2 I installed it with default settings,
then I loaded the "pgAgent.sql" script against the postgres database. pgAdmin
can now manage jobs. I created a simple job that should insert a row in a test
table. All ok. The problem is that I am not able to enable the schedule. When I
enter the schedule properties form the "Enable" check box is always grayed out.
I check it, clik Ok and exit, but the schedule is still set to not enabled. The
ID is one, the start date is set to yesterday and the end one to the
future. All the other time properties are set to Every.
At this point I have install
the pgAgent service yet, but i think Jobs should be managed even without the service
running isn't it?
Thanks,
Paolo
Saudin