It's third Thursday and the Intel OPNFV Pharos Lab Maintenance will be this 
week on 2/21 from 1-4 PM Pacific.
Impact should be minimal with the exception of our IXIA Load Generation, which 
will moved into another location in a different rack.
It will need to be powered down and unhooked for the move to the next rack over.

Tim Gresham
Cloud Engineer - Intel Corporation
Intel Architecture, Graphics and Software

-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.

View/Reply Online (#22823): 
https://lists.opnfv.org/g/opnfv-tech-discuss/message/22823
Mute This Topic: https://lists.opnfv.org/mt/29941481/21656
Group Owner: [email protected]
Unsubscribe: https://lists.opnfv.org/g/opnfv-tech-discuss/unsub  
[[email protected]]
-=-=-=-=-=-=-=-=-=-=-=-

Reply via email to