We were talking about the stress test:

Step 1 measure dataplane performance between a pair of VMs
       (baseline)

Step 2 Begin the lifecycle of a new VM pair and
       measure dataplane performance between a pair of VMs

Step 3 (Under discussion)

Measure traffic (throughput, loss) 
between the second pair of VMs at the same time
as the first pair.
When you do this, you should see:

1. reduced ability to generate traffic and receive
   traffic correctly in each VM pair (under stress)

2. reduced throughput and increased loss from the 
   the single VM-pair case (baseline).

3. the change from the baseline may be 
   more than a factor of 2 (reduction for Thrpt,
   increase for Loss)

I think this form of stress test would illustrate
the deviation from linear when increasing workload.
However, it may only be applicable to the test VM-pairs,
and not extend to VNFs in general (although that would be
another aspect to test.

HNY everybody,
Al