Hi doctors, For the issue about the notification time is large than 1S. I check the log and find out that from the inspector received the event to nova-api begin to handle the reset_state is taken up most of the time, about over 80%. For example, the total notification time is 2.26s, the process of inspector takes 1.983s.
In the test inspector script, we find all the VM under all telant, and then set all the VM states as error. As we need to improve the performance,but it can not be handle in a short time. Shall we extned 1S to 3S or change back to no failed to notification time calculation to let functest green? Meanwhile doing the performance improvement, then change it back? Any suggestions will be welcome. Thank you~ BR, dwj 董文娟 Wenjuan Dong 控制器四部 / 无线产品 Controller Dept Ⅳ. / Wireless Product Operation 上海市浦东新区碧波路889号中兴通讯D3 D3, ZTE, No. 889, Bibo Rd. T: +86 021 85922 M: +86 13661996389 E: [email protected] www.ztedevice.com
_______________________________________________ opnfv-tech-discuss mailing list [email protected] https://lists.opnfv.org/mailman/listinfo/opnfv-tech-discuss
