Hi everyone, Rather than waste a design summit session about it, I propose we review the proposed Kilo release cycle schedule on the mailing-list. See attached PDF for a picture of the proposal.
The hard date the proposal is built around is the next ("L") Design Summit week: May 18-22. That pushes back far into May (the farthest ever). However the M design summit being very likely to come back in October, the release date was set to April 23 to smooth the difference. That makes 3 full weeks between release and design summit (like in Hong-Kong), allowing for an official "off-week" on the week of May 4-8. The rest of the proposal is mostly a no-brainer. Like always, we allow a longer time for milestone 2, to take into account the end-of-year holidays. That gives: Kilo Design Summit: Nov 4-7 Kilo-1 milestone: Dec 11 Kilo-2 milestone: Jan 29 Kilo-3 milestone, feature freeze: March 12 2015.1 ("Kilo") release: Apr 23 L Design Summit: May 18-22 All milestones avoid known US holiday weekends. Let me know if I missed something or if you see major issues with this proposal. Regards, -- Thierry Carrez (ttx)
kilo.pdf
Description: Adobe PDF document
_______________________________________________ OpenStack-dev mailing list OpenStack-dev@lists.openstack.org http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev