In the UK we have a number of locations which are permanently wired with 
overhead line, but the wires are permanently earthed. This is typically done 
where the OCL is out of use in depots (for safety), to pass OCL through a very 
low bridge where electrical clearances cannot be provided, or at the limit of 
an electrified line.

Has this been dealt with before? I would propose the following approach:

electrified=contact_line
voltage=0
frequency=<unset>

Reply via email to