On 1/12/22 9:21 PM, Mark Tinka wrote:
On 1/12/22 21:41, Michael Thomas wrote:
We just installed a battery too, but it will probably only last ~1
day and much less than that in winter. We're in the process of
looking at a generator that interfaces directly with the inverter so
that it handles the grid, the battery, the solar and the generator
along with the transfer switch.
Or maybe the other way around - perhaps you should be looking for an
inverter that handles all power sources... battery, utility and
generator, so you don't have to worry about managing the transfer.
That's what I have. Or at least that's what SolarEdge is promising for
the generator part of the equation with a software upgrade.
Mike