Dwight:
Everything you have written was very helpful. The "Add advanced" was
something I was lacking knowledge about. Now I am better equipped to get
MLO to do what I need.
Thank you for your instruction.

On Mon, Dec 21, 2020 at 9:42 PM Dwight Arthur <[email protected]> wrote:

> Hi, Bob.
>
> First issue involves where you set the project status. Maybe I am reading
> it wrong, but it sounds like you are setting project status on each task
> that's part of the project. I would suggest instead creating a parent and
> putting all of the project tasks as children of that parent. Set "this is a
> project" for the parent but not for the children. I have projects like
> "year end accounting" and "replaster swimming pool" and "grant renewal for
> clinic" - each of which has a bunch of child tasks comprising the work that
> needs to be done. It is often the case that the parent project has
> "complete subtasks in order". The difference between a project and a simple
> collection of to-do items is that the project usually has multiple steps,
> often a later task cannot be begun until earlier tasks have completed, the
> project is not considered done until the last subtask is completes, and it
> makes sense to set up a progress bar that shows how much of the project is
> done and how much remains.
>
> Now, lets talk about what is supposed to be in the view that you have in
> the Projects tab. Lets start with something that might be obvious, my
> apologies if you are already on top of this, but tabs are not a great way
> to save a set of filters and such - once you get it set up how you want,
> it's far too easy to make a change, intentionally or by mistake, and then
> struggle to try to reverse the change. What you should do is, once you get
> it set up how you like you should save it as a view. After any future
> changes you can reload the view to put it back the way you want it
>
> So, when you are creating a view, you need to set up filters that select
> the items you want to show, and also specify how the display should be
> organized. The "Group by" control affects how your items will be displayed
> but does not have any effect on which items are selected to be included in
> the view. To show your projects you want to select each of the project
> items, but you also want to include all of the children under each of the
> projects. Any view that shows parents and children arranged in hierarchies
> is called a hierarchical view. So what you want is to select every item
> that says it is a project and show them all, with a hierarchical view of
> the child tasks.
>
> A setup for a project view like this would involve the following settings
> in the view specifications in the left hand sidebar:
>
>    - Show Actions: All
>    - Show Hierarchy: Yes
>       - hit the "config" button after show hierarchy
>       - include children. Do not include parents
>    - Show completed: yes
>    - Advanced: set the "add advanced" checkmark
>       - hit the "setup" button
>       - hit "add rule"
>       - enter "IsProject is True"
>
> This should give you roughly the view you seek. You do not need the
> group-by control unless you have a view with some projects and some
> non-project items and you want to break the report into two sections, one
> for projects and the other for non-project tasks.
>
> hth
>
> dwight
>
>
> On 12/21/2020 16:51, Stéph wrote:
>
> I think you've got me stumped there, Bob. I have a View in which I group
> by top level parent (which happens to be four areas of my life: personal,
> home, work and community) and then by project status (in progress,
> suspended, completed, etc). I just tried converting the second level of my
> groups to "IsProject" and I get all my projects listed under the group
> value "Yes".
> [image: Grouping tasks by IsProject status.png]
>
>
>
> Definitely, though, it's more useful to group tasks by Project Status:
> [image: Grouping tasks by Project Status.png]
>
> All the best,
> Stéphane
>
>
> On Monday, 21 December 2020 at 18:54:18 UTC [email protected] wrote:
>
>>
>> My understanding of PROJECTS in MLO is very poor. I have designated
>> several tasks as a project. That is I have clicked on the "This is a
>> project" for that task. Then I have made a TAB I call Projects. Within that
>> TAB I have under the Filter "Group by..." I have selected the first option
>> "Is Project". But the list I get does not show any of my Projects.
>> What am I doing wrong?
>> Thanks,
>> Bob Young.
>>
> --
> You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/mylifeorganized/fd223f17-6788-46e9-93d2-27e02e3899b0n%40googlegroups.com
> <https://groups.google.com/d/msgid/mylifeorganized/fd223f17-6788-46e9-93d2-27e02e3899b0n%40googlegroups.com?utm_medium=email&utm_source=footer>
> .
>
> --
> You received this message because you are subscribed to a topic in the
> Google Groups "MyLifeOrganized" group.
> To unsubscribe from this topic, visit
> https://groups.google.com/d/topic/mylifeorganized/nRc8FLTofC0/unsubscribe.
> To unsubscribe from this group and all its topics, send an email to
> [email protected].
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/mylifeorganized/b8ea9aa1-2ed4-a9dc-99a4-0c07ccf22c92%40gmail.com
> <https://groups.google.com/d/msgid/mylifeorganized/b8ea9aa1-2ed4-a9dc-99a4-0c07ccf22c92%40gmail.com?utm_medium=email&utm_source=footer>
> .
>


-- 
*Robert S. Young*

*[email protected] <[email protected]>*
*360-320-5001*

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/CANOu5wVZJFRQa8Ea2B%2BjHpuQhVuxRDB7Q%3DXiX8pkPF0p7c4vRg%40mail.gmail.com.

Reply via email to