Would there be any ‘problem’ with configuring a 2-machine CARP setup and then 
just keeping one machine powered-off until needed?

I realize this defeats live failover, but this is not a requirement for my 
customer.

I just want them to be able to, in the event of a primary machine failure, 
power-on the secondary and have it take over.  Logic here is to otherwise not 
have the secondary sucking power off the UPS’s in the event of a power failure, 
or in general.

Legit?

Reply via email to