Le 30/11/2015 10:59, Scott Kostyshak a écrit :
On Sun, Nov 29, 2015 at 08:44:34PM +0100, Jean-Marc Lasgouttes wrote:
Le 29/11/2015 16:39, Richard Heck a écrit :
I'd suggest beta in two weeks if we don't run into any serious problems,
then see how that goes. If well, then we can shoot for RC in mid-January.
This looks good to me.
Uwe will be away in two weeks. The last day he will be able to build an
installer is December 11, which to me means we should plan on the last
day being December 10, just in case there is a problem. He will be back
on January 6.
Should we aim then for a beta on December 10? This seems too quick to
me, but I'm fine to proceed if this is what others want.
Scott
Well everybody knows that time freezes for two weeks at the end of
December for most people here anyway so it's not a real delay. I am
happy to have an accelerated release schedule (I have nothing absolutely
necessary to implement before that) but I had made mental plans
according to what was announced initially.
I have an implementation of http://www.lyx.org/trac/ticket/7790 (which I
mentioned among the things that I would like to finish for 2.2.0 when
Scott asked about it). I might have a polished version soon, though
certainly not before Dec 10th.
I am not worried about having this between alpha and beta because I can
do at first a set of changes that are innocuous. In case I do not have
time (for instance if you want to accelerate the schedule) is it
possible to implement the format change (which I feel is stable now) for
2.2.0 and implement the polished visible changes in 2.2.1 or 2.2.2?